Due to high fault occurances on a section of OHL in Doncaster, South Yorkshire; Northern Powergrid chose to replace the circuit with underground cables along a route approximately 1km in length from concrete gantry outdoor sealing end structuresat each substation.
Wootton & Wootton were contracted to modify the existing OHL concrete support structures into CSE structures, install intermediate straight joints (power & communications), installation of cable sealing ends, site supervision and pressure testing upon completion.